Surselva gets a test facility for wind and solar energy
The Federal Office for Armaments (armasuisse) wants to set up a small wind and solar system in Surselva. The test facility is intended to determine the potential of hybrid systems in the Alpine region. Armasuisse Immobilien has now submitted the planning application.
The Federal Office for Armaments wants to set up one of the first small wind and solar systems in Switzerland in the Alpine region next to the middle station of the former military transport cableway above Medel, armasuisse informs in a press release . The test system is intended to test “the suitability of a hybrid system for generating sustainable energy in alpine terrain”, it says there.armasuisse Immobilien has now submitted a corresponding planning application. It can be viewed from August 29th to September 28th at the Municipality of Medel.
The planned small wind turbine with bifacial solar panels is scheduled to go into test operation next autumn. Armasuisse expects a yield of 27 megawatt hours per year for the wind turbine, for the wind flower the estimated annual yield is 35 megawatt hours. Based on the evaluations of the actual results planned for the fourth quarter of 2024, armasuisse wants to decide whether a total of nine hybrid systems will be installed in the La Stadrea area in Surselva. The location offers "good conditions both in terms of existing and no longer used infrastructure, as well as in terms of wind conditions and solar radiation," writes the Federal Office.