New GLC research building, ETH Zurich: Today's facade technology for tomorrow's health sciences

April 2022

A milestone for medical technology: With its new building in Gloriarank, ETH Zurich is creating a future-oriented development and laboratory building. The structure presents itself as a perfect marriage between technology and health sciences; the attractive steel façade by Aepli Metallbau with glass blocks skilfully transforms the design tradition of university buildings into the modern age.

With the new building in Gloriarank (GLC), ETH Zurich is creating a modern development and laboratory building at the interface between health sciences and technology in the university district of Zurich Zentrum. Together with partners, ETH Zurich would like to set a milestone in medical technology research and application. Research groups will meet in the new building and work more closely together on research projects with industry, the University of Zurich, the University Hospital Zurich and other university hospitals. ETH Zurich is also making an architectural statement with the new building. The attractive connection of the structure to the existing ETZ building creates a central courtyard, the heart of which is the listed Scherrer lecture hall. The inner courtyard created in this way becomes the center around which the main entrances and public facilities are grouped.

When it comes to architecture, “Everything is Roger” here.
He speaks of "Maison de Verre", but in this case he does not mean the famous 1930s glass house in Paris – the Zurich architect Roger Boltshauser. Rather, with the GLC research building, he created a sensational building that, with its glass facade made of glass block elements assembled in a cassette-like manner and the ventilation wings staggered in depth, creates a sublime heaviness that does justice to its representative character. Since the use of glass blocks as a façade material in contemporary industrial and university buildings has a long tradition, the architect redesigned the material for this project in terms of design, technology and energy. It not only meets today's enormously high demands on energy and sustainability. Rather, through the combination of reduction and robustness of the elements used, the design corresponds to the basic urban planning attitude of the quarter.

Thinking together means thinking ahead.
3,866 m² of steel facade, 22,550 m² of floor space, 1,875 mm high casement windows with a projection of 2,800 mm, the strictest environmental and fire protection standards and much more: the new GLC building was a challenge in every respect, which was mastered thanks to the open and constructive exchange of ideas between the companies involved was mastered. A good example of this are the particularly heavy cleaning blades. Due to its complex geometry, Aepli Metallbau – in cooperation with Jansen AG – subjected it to an endurance test beforehand. A prototype was specially built for this purpose. Exactly 1250 problem-free openings and closings later, it was clear: everything works perfectly!

Contact:
Matthew Elmer
Aepli Metallbau AG
Direct phone +41 71 388 82 38

www.aepli.ch

More articles