Warning: _() expects exactly 1 parameter, 2 given in /home/immoinve/public_html/immoinvest.cyon.site/dev/wp-content/themes/immoinvest/template-parts/content/post.php on line 8

“Lindenpark” development: mixed living in the center

Zug, April 2021

The five apartment blocks in the west of the historic Unterdorf should be ready for occupancy in 2023 and further strengthen the center of Steinhausen.


Notice: Undefined variable: excludeTagsCountForSimpleParser in /home/immoinve/public_html/immoinvest.cyon.site/dev/wp-content/plugins/TooltipProPlus/glossaryFree.php on line 1771

The area between Erliweg and Birkenhaldenstrasse in Steinhausen is one of the last plots in the village center that can be built on. The landowner Viktor Jans – landlord of the Gasthaus zur Linde – has commissioned the architects Mächler und Töngi from Rotkreuz with the "Lindenpark" development. Since 2020, five buildings have been erected here, arranged in an oval shape. A green space is planned in the middle.

The tallest building with seven storeys and the largest with 757 square meters is located in the south of the plot on Bahnhofstrasse. 26 apartments are being built here. The buildings are reduced in every dimension towards the north. Houses 2 and 3 still have five floors and houses 4 and 5 have four floors. This is a conscious reaction to the surrounding environment. Thanks to the staggered height, the structures are optimally fitted into the existing picture, and at the same time the tradition of large-scale buildings along Bahnhofstrasse is taken up. The facades are bent several times so that the new buildings appear softer and less angular. In addition, the entire development is given a dynamic movement towards the edge.

Mostly small apartments are planned. Some larger apartments are intended to create new living space for families. The attic apartments are located in the southern area of the building. In this way they support the sloping movement of the buildings to the north. The project includes 148 parking spaces. A green courtyard with a play and lounge area and an open area with a garden restaurant to the south are planned in the center of the development. Photovoltaic systems on the roofs ensure an environmentally friendly power supply. The facades are uniformly materialized with a glued stone facade with a clinker look. In this way, they blend in harmoniously with the “Dreiklang” development on the opposite side.

The existing barn, which is located in the south-eastern area of the "Lindenpark", is being converted into a multifunctional cultural space with a restaurant. Further public uses are planned on the ground floor level in the area facing Bahnhofstrasse.

The planned development from above.

Weitere Artikel