Warning: _() expects exactly 1 parameter, 2 given in /home/immoinve/public_html/immoinvest.cyon.site/dev/wp-content/themes/immoinvest/template-parts/content/post.php on line 8

Rheinfelden Solar puts third system into operation

Aarau, August 2021

The Rheinfelden Solar project, operated by AEW Energie together with the City of Rheinfelden AG, will put its third solar system into operation in September. It will be installed in the work yard and fire department store in Stein AG. Interested parties can now purchase modules.


Notice: Undefined variable: excludeTagsCountForSimpleParser in /home/immoinve/public_html/immoinvest.cyon.site/dev/wp-content/plugins/TooltipProPlus/glossaryFree.php on line 1771

The Rheinfelden Solar project will shortly put its third solar system into operation, AEW Energie informs in a press release . The system with a peak output of 110 kilowatts is being built as part of a roof renovation on the works yard and fire department store in Stein. A total of 290 modules will be installed here.

In the Rheinfelden Solar project, interested parties can support solar energy without having to set up their own solar system. Instead, they finance a system installed by Rheinfelden Solar with a one-time contribution per module. In return, those involved are credited with the electricity they have produced with the modules they finance over a period of 20 years in their own electricity bills.

The modules of the system in Stein are sold at the same conditions as those of the considerably larger second system from Rheinfelden Solar on the roof of the Swisslos logistics center in Rheinfelden. Interested parties can now order the desired number of modules online at a price of 560 francs each, explains AEW Energie. From the beginning of 2022, 240 kilowatt hours of electricity per purchased module should be credited to the electricity bill.

Weitere Artikel