Government is slowing down traffic planning for Baden
The new overall traffic concept for the Baden-Wettingen area was met with reservations at the hearing. The conversion of the Baden high bridge and the new Limmat bridge are criticized. The government council therefore does not want to set the concept in the structure plan yet.
The new overall traffic concept for the Baden-Wettingen area has to go into an additional planning loop. According to a press release , the Aargau government council decided to leave the concept at the stage of the interim result. In doing so, he is responding to reservations that were expressed in the public hearing.
In the hearing, for example, it was demanded that the Baden high bridge could also be used by cars in the future. This would also eliminate the need for a new Limmat bridge between Baden and Wettingen. In the Siggenthal a higher traffic load is feared. With the additional planning loop, the continuation of the Limmattalbahn beyond Killwangen could also be included in the planning in the future.
However, the government council makes an exception in the overall transport concept: the Velosteg between Neuenhof and Würenlos should already be specified in the structure plan. This could secure the federal funds for the project.
The overall traffic concept for the Brugg-Windisch area, on the other hand, is to be specified in the structure plan. These include the center relief and the bike route.