Warning: _() expects exactly 1 parameter, 2 given in /home/immoinve/public_html/immoinvest.cyon.site/dev/wp-content/themes/immoinvest/template-parts/content/post.php on line 8

Lidl is planning branches for the future

Weinfelden TG/Dübendorf ZH, January 2021

Lidl Switzerland wants to make its branches more energy efficient and sustainable. To do this, the retailer is working with the Federal Materials Testing and Research Institute (Empa).


Notice: Undefined variable: excludeTagsCountForSimpleParser in /home/immoinve/public_html/immoinvest.cyon.site/dev/wp-content/plugins/TooltipProPlus/glossaryFree.php on line 1771

Lidl Switzerland had already committed itself in 2014 to make the operation of its branches more sustainable, informs the retail company in a message . After all, the energy consumption of 150 Swiss Lidl branches corresponds to that of a medium-sized city in the country. The savings potential is correspondingly large.

New branches are to be implemented as early as this year with the help of an innovative energy concept, the communication further explains. "It is very important to us that our future locations are future-proof and sustainable with regard to building materials, energy consumption and technology", Reto Ruch, Chief Real Estate Officer of Lidl Switzerland, is quoted there. Lidl Switzerland is working with Empa to develop this energy concept.

In a first step, the two partners will analyze the energy consumption of the existing branches. As a result, optimization measures should then be derived from this. At the same time, Empa and Lidl want to test alternative energy systems with the help of computer simulations. "Our goal is to help Lidl Switzerland with our research work to further improve sustainability, continue to reduce emissions in the future and optimize energy management," explains Empa researcher Curdin Derungs in the press release.

Weitere Artikel