Sargans Cantonal School is being renovated for 50 million francs
The Sargans canton school, which is now over 50 years old, will be renewed and expanded from summer 2023.
The Sargans canton school has been in operation in its existing form for over 50 years and is in need of renovation. It can no longer meet today's structural requirements in terms of earthquake security, building technology and insulation. There is also a lack of around 1900 square meters of school, preparation and group rooms that ensure modern teaching in the long term. In addition, central facilities such as the cafeteria are too small and there are only a small number of student and teacher workplaces.
The plan is to demolish the west and south wings dating from 1963 and 1969. They will be replaced by contemporary new buildings. L-shaped extensions are to be built, which together with the east and north wings form a rectangular structure. At the center is an identity-creating courtyard.
The new west wing will house the cafeteria with outdoor seating, a kitchen, foyer, auditorium and some classrooms. In the new south wing there is space for additional class, subject and group rooms as well as rooms for administration and teaching staff. In the east and north tracts, there are mainly renovations with regard to earthquake security. Continuous access corridors on the upper floors ensure short connecting routes with common areas.
A loan of CHF 49.9 million was granted for the project. Of this, 3 million are for the existing buildings and 46.9 million for the new buildings. Construction work is scheduled to begin in summer 2023 and will last three years. School operations in the east and north wing will continue – temporary arrangements will be built for the south and west wing.
The St. Gallen electorate approved the building project in 2014. A total of 17 objections were received in 2018. These were rejected by the municipality of Sargans, but a resident filed an appeal against the decision with the Department of Economic Affairs. This also rejected the objection, whereupon the recurrent filed the complaint before the federal court. In May 2021, the latter also rejected the complaint in the last instance. Now nothing stands in the way of the planned renovation and expansion of the canton school.