Warning: _() expects exactly 1 parameter, 2 given in /home/immoinve/public_html/immoinvest.cyon.site/dev/wp-content/themes/immoinvest/template-parts/content/post.php on line 8

AMAG Winterthur puts new solar system into operation

Winterthur, November 2021

The AMAG Group has put a photovoltaic system into operation for Volkswagen at the Winterthur location. It should deliver around 158 megawatt hours of electricity annually. The car importer wants to be climate-neutral by 2025. For this purpose, three solar systems have already been inaugurated this year.


Notice: Undefined variable: excludeTagsCountForSimpleParser in /home/immoinve/public_html/immoinvest.cyon.site/dev/wp-content/plugins/TooltipProPlus/glossaryFree.php on line 1771

The AMAG Group has put a new photovoltaic system into operation at its Winterthur location, informs the automotive trading group for all brands of the Volkswagen Group in a message . The system built by Helion with an output of around 157 kilowatts peak was installed on the roof of the AMAG building for Volkswagen and VW commercial vehicles. The group intends to use around 60 to 65 percent of the approximately 158 megawatt hours of solar power expected annually.

“With the solar energy obtained from the photovoltaic system, we can cover around 60 percent of our electricity requirements at the Zürcherstrasse 312 location in Winterthur,” Martin Zgraggen, Managing Director of AMAG Winterthur, is quoted in the press release. “The increasing number of electric vehicles means that more electricity is required, which the new solar system supplies us.”

The AMAG buildings for the Audi and Skoda brands in Winterthur were equipped with a solar system back in 2013, the press release explains. The group had the first photovoltaic system installed on the roof of its central spare parts warehouse in Buchs ZH in 2008. In the current year, in addition to the new system in Winterthur, two further solar systems were installed in Wettswil am Albis ZH and in Basel.

The automobile trading group with its headquarters in Cham ZG wants to be completely climate-neutral by 2025. To this end, solar systems are to be installed on an area of around 50,000 square meters by 2024. The group is looking into a deployment for a further 100,000 square meters of space at AMAG locations.

Weitere Artikel